Richard, the route planner doesn't use the cycleway/footbridge over the A421 at Tingewick. For example it currently suggests going from Barton Hartshorn to Tingewick the 'long way round'. The cycleway/footbridge is locally signed (from the south, at least) and is of reasonable quality apart from having a poor surface north of the bridge. Chris